Introdução

Replacement of the stack assembly on any Kaffelogic Nano or Nucleus Link coffee roaster with a D or P prefix serial number.

  1. bEdI12xSfVQDKaCd
    bEdI12xSfVQDKaCd
    keWYfIuvFMvyWLWV
    • Remove the 6x 2.5mm Hex screws on the left and right side of the roaster.

    • Take care not to damage the buttons while maneuvering the front panel, with all six screws removed it may fall away.

  2. MhQ4bjGDjKieVDbY
    MhQ4bjGDjKieVDbY
    Nqrlq6TYIlRCEmPp
    • Hold the front panel steady while removing the plastic top/closure.

  3. JttMZ1MrHIv3w14y
    • Pull away the front panel carefully.

  4. xlnoDyLNHUxvifcH
    xlnoDyLNHUxvifcH
    BA3QijfXOOId6nAg
    3OUB1gVyYEkIiqKS
    • Remove the last 2.5mm Hex screw securing the rear panel.

    • Pull up on the rear panel to remove it from the roaster.

  5. id1Iu26FpOZgSFqK
    id1Iu26FpOZgSFqK
    bgPTsWYHJElkbeUh
    • Set the panels aside somewhere safe and bask in the beauty of your naked roaster.

  6. rbPlPYM5dJ5Kqsfc
    rbPlPYM5dJ5Kqsfc
    OJ1dFjaeiE1gVBQ5
    auO6jGHnRpoNIpXT
    • Use a 2.0mm slotted screwdriver to remove the thermocouple wires from the PCB-A

  7. nKqCwNjM6uRb5CUO
    nKqCwNjM6uRb5CUO
    JwHDA56JQ5y26JFW
    YrRunmyTjLi6etYP
    • Use needle-nose pliers to pull the roast chamber earth lead away from the earthing point.

  8. rUP4NXAAeTfGsyTg
    • Remove the roast chamber from the element chamber.

    • Head through to our wiki for instructions on recalibrating your fan speed after this repair.

    • Nucleus Link anemometer calibration instructions can be found here.

  9. yBiBcOdWjApvAhKT
    yBiBcOdWjApvAhKT
    Nx2TyBOE1MyDDTDW
    WpFXrPqNstFC2LqP
    • Remove the terminal PCB cover and set it aside. This is held in with four small plastic clips at each corner.

  10. pduFJLWZJLHjr3pL
    pduFJLWZJLHjr3pL
    eFfZxC1MXCGjC6GA
    vW3lIywDCJtCcewc
    • Remove all four connectors on the left side of the terminal PCB.

    • These are marked an N (Neutral), TN (Transformer Neutral), TL (Transformer Live) and L (Live)

  11. aO6A1RDqu6bHUbmx
    aO6A1RDqu6bHUbmx
    DTJIapDCB63Krqrb
    • Disconnect the motor cable, this may take some wiggling.

    • Refrain from using pliers or metal tools on this connector, as the plastic insulation can be damaged.

  12. fXMMiTHutXD2p1CZ
    fXMMiTHutXD2p1CZ
    DNSerrNMynQmcBto
    • Pull upwards on the SSR signal connector to remove it.

  13. xPUY1Sc1boBisKjJ
    xPUY1Sc1boBisKjJ
    ScwrHfbCIPEWek4d
    DYwfTvIdjES4ZJyO
    • Remove the mains earthing connector from the tab. Pliers can be used for this as it can be tight.

  14. sRcctEvAxbpOWmMA
    sRcctEvAxbpOWmMA
    KZRmjLb12cF6sAQr
    52rgaYuMgDlFpoqT
    • Remove the 4x 2.5mm Hex screws securing the gantry plate to the aluminium uprights. A long driver bit is recommended for this.

    • Some early roasters will have sprung earth tabs on the right hand side of the roaster, please place these back as they were found during reassembly.

  15. PGftoVjkWCNhOjdd
    PGftoVjkWCNhOjdd
    2WNNA4nLVLrGP5w3
    GgRfiBIbn2YK4dBS
    • Pull upwards on the stack to remove it from the base assembly.

  16. RgxW3EVe1A3BeAaD
    RgxW3EVe1A3BeAaD
    EYWJrK4BOVGcmO2G
    rOCZwQ2AHrQhmXpq
    • Well done! Your stack assembly is free!

    • During reassembly, the star washer should be placed between the gantry plate steel and the earthing tab as pictured.

    • There is a hole in the gantry plate to route the transformer primary wires through. Hold them to the side as you place the new stack.

    • Head through to our wiki for instructions on recalibrating your fan speed and element resistance after replacing the stack. Nucleus Link anemometer instructions can be found here.

Conclusão

To reassemble your device, follow these instructions in reverse order.

Kaffelogic

Membro desde: 23/07/25

2356 Reputação

0 comentários